UURL 財經新聞FINANCE
UURL Finance · Taiwan market + in-depth rewrites · hourly

Xintec Hits Third Straight Limit-Down at NT$379 as Bullish News Fails

Browser TTS · no download

30-second brief

After limit-down closes in the previous two sessions, Xintec locked at the NT$379 limit-down again on the 18th, with volume of about 21,000 lots. The bullish news of a more than 7-year CoWoS outsourcing deal with TSMC failed to lift shares, as institutional investors flagged four concerns including early pricing-in. Sell orders narrowed to 500 lots, with first-phase mass production in 2029.

Three Straight Limit-Downs, Shares Locked at NT$379

Xintec (3374) extended its decline. After limit-down closes in the previous two trading days, it fell again at the open on the 18th and hit limit-down, locked at NT$379, down nearly 10%, becoming the hardest-hit stock on the market. Xintec was locked at limit-down near 10 a.m., with trading volume of about 21,000 lots. During the limit-downs in the previous two trading days, sell orders at one point reached several thousand lots, while sell orders quoted at today's limit-down price have narrowed to about 500 lots, with selling pressure easing notably from previous days.

More Than 7-Year CoWoS Outsourcing, Mass Production in 2029

According to an announcement by Xintec, the company signed a capacity outsourcing agreement of more than seven years with TSMC, under which the two sides will build a CoWoS-related oS-module back-end process production line at TSMC's Central Taiwan Science Park fab, with Xintec responsible for production and operation. CoWoS is TSMC's advanced packaging technology. The first phase of this production line is expected to enter mass production in 2029, with the cooperation period running through the end of 2033. As entering the oS business requires building production equipment and automated material handling systems, the Xintec board also approved the issuance of NT$15 billion in unsecured convertible bonds.

Xintec previously disclosed that its new testing plant was completed in the second quarter of this year, with all machines moved in by the end of August, and new capacity focused mainly on wafer testing (CP), which is expected to drive growth from the second half of this year into next year. But existing plant space is already fully occupied, so any new customer demand will require acquiring land for a new plant, and after the testing capacity expansion ends in 2027, revenue growth will rely mainly on higher utilization rates.

Four Major Concerns Dampen Chasing Demand

Market concerns about this cooperation focus on four points: first, news of the signing had already circulated in the equipment circle about three months ago; second, TSMC's testing and packaging outsourcing has historically been more of a theme than an actual profit contributor; third, mass production only starting in 2029 means its move into advanced packaging clearly lags peers; and fourth, Xintec shares had previously topped NT$500, with the P/E ratio reaching 43 times, high among testing and packaging peers, while growth momentum in 2027 to 2028 is weaker than peers. Institutional analysts said securing TSMC's CoWoS back-end oS capacity outsourcing does have long-term strategic significance, but Xintec had risen for six consecutive trading days before the announcement, with a cumulative gain of about 40%, closing limit-up at NT$519 on the 13th, while the new production line schedule is later than the market's earlier expectation of 2027 to 2028, offering limited help to near-term earnings, cooling chasing demand.

FAQ

Why did Xintec post three straight limit-downs?

After limit-down closes in the previous two trading days, Xintec was locked at the NT$379 limit-down again on the 18th, mainly as the bullish news was priced in early, the P/E ratio reached 43 times, and mass production only starts in 2029, offering limited help to near-term earnings.

What does the cooperation between Xintec and TSMC cover?

The two sides signed a capacity outsourcing agreement of more than seven years to build a CoWoS-related oS-module back-end production line at TSMC's Central Taiwan Science Park fab, to be produced and operated by Xintec, with first-phase mass production expected in 2029 through the end of 2033, and NT$15 billion in unsecured convertible bonds to be issued to fund equipment investment.

What are the four major market concerns about the cooperation?

First, the news had already circulated three months ago; second, testing and packaging outsourcing is more theme than earnings; third, mass production in 2029 lags peers; and fourth, the share price exceeded NT$500 with a high P/E ratio, while growth momentum in 2027 to 2028 is weaker than peers.