Tsai Shih-ping Claims to Have Blocked Proposal; Palace Museum Denies It and Demands Apology
Taipei City Department of Cultural Affairs Commissioner Tsai Shih-ping said on Facebook that the National Palace Museum had originally planned to install solar photovoltaic equipment on the rooftops of its campus buildings, which he rejected, and used AI to create an illustration showing the Palace Museum covered with solar panels. He cited Articles 24 and 30 of the Cultural Heritage Preservation Act, emphasizing that preservation, restoration and reuse of cultural heritage should preserve the original appearance and retain facade elements as a basic prerequisite.
The Palace Museum subsequently issued a statement denying it had ever made such a proposal, and criticized Tsai, as head of the cultural heritage authority, for using claims without factual basis and AI-generated images to create the false impression that solar panels would be installed on the Palace Museum's rooftops, misleading the public and harming the Museum's image, demanding that he immediately remove the post and image and publicly clarify and apologize. Tsai fired back again, disclosing an official document from the Palace Museum, saying the document stated that because the Energy Administration under the Ministry of Economic Affairs sought to clarify the rooftop area of buildings available for solar installation, reasons must be given if installation was not possible, and assistance was requested to interpret the appropriateness of installing solar on rooftops, which he viewed as having been directed by the Energy Administration to seek approval for installation.
MOEA: Inventory Is Not Coercion, Survey Is Not a Proposal
The Ministry of Economic Affairs clarified on the evening of the 19th that the official document never mandated the Palace Museum or any agency to build solar facilities, but was only issued to survey and inventory conditions, stressing that an inventory is not coercion and a survey is not a proposal, asking the public not to distort official documents or mislead society, and calling Tsai's claims false information.
The Energy Administration reconstructed the background, saying that because rooftop solar has the greatest social consensus, the government is prioritizing public rooftops for demonstration, and on May 27 the Energy Administration wrote to ministries and agencies asking them to confirm rooftop area and installation status building by building, and explicitly listed reasons for exclusion, including cultural heritage, aging buildings, renovation plans, safety concerns, mixed residential-commercial use, co-located offices, and rooftops too small in area, all of which are categorically excluded; for non-heritage buildings and parking lots, agencies are to assess structural safety, use needs and landscape compatibility on a case-by-case basis.
Citing Coexistence of Heritage and Green Energy, Explaining Cultural Heritage Act Rules
The Energy Administration cited examples that, with proper construction methods and respect for the cultural heritage authority, heritage sites can also coexist with green energy. For example, under Taipei's Net-Zero 101 Plan, the nationally designated monument Mengjia Longshan Temple installed flexible solar panels and an energy storage system on the exterior wall of its administrative building on April 28, 2025 using non-destructive methods, witnessed in person by Mayor Chiang Wan-an; the municipally designated monument Ximen Red House's Little Octagon Building also introduced solar and energy storage systems in May 2026 using a non-drilling clamp-fixed method, while non-historic buildings or ancillary spaces may be handled appropriately on a case-by-case basis.
Under Article 3 of the Cultural Heritage Preservation Act, historic buildings refer to buildings and ancillary facilities with historical, local or cultural and artistic value that should be preserved; Article 42 provides that the new construction, expansion, alteration, repair, relocation, demolition, or change of exterior appearance or color of buildings and structures within the preservation land or preservation area of a monument, historic building or memorial building shall be approved by the competent authority for the relevant undertaking, and is not completely prohibited from alteration. Taipei has past cases of historic buildings preserved by relocation or preserving only imagery, such as the Taipei Memory Warehouse, Xinbeitou Station and Zhongshan Bridge.